Bug-o-systems Modular Drive System Manual do Utilizador Página 29

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 57
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 28
29
PENDULUM WEAVER II SETUP
INSTALLATION
The Weaver Control Module plugs into the Master Drive Unit. Use a at blade screwdriver to rmly secure
the four corners of the module.
Remove connector cover plate from MPD-1000. Plug the Pendulum Weaver Electronics box into the front
end of the Master Drive Unit. Secure the box to the drive unit by using the four captive screws on the elec-
tronics box.
Bolt the mounting plate onto the front of the carriage, below the electronics box, and bolt the rackholder onto
the mounting plate. Insert the 14" (355 mm) rack through it.
Several different arrangements can be used to mount the gearbox on the rack and to position the welding
gun. One recommended assembly method is shown below: bolt the racks, gearbox, and clamps together as
shown in the diagram.
Finally connect the gearbox to the electronics box using the cable supplied, with 6-pin connectors on each end.
Vista de página 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 56 57

Comentários a estes Manuais

Sem comentários